
Expertise 5 / 5
Change of use, added storeys, new loads, new openings or visible defects: we survey the existing structure, check what it can carry and design safe, buildable and economical strengthening.

01When to call us
As soon as works change the loads or geometry of a building, its structure must be checked and, if needed, strengthened.
02Our approach


03Strengthening techniques
We compare options to choose the safest, simplest and most economical, taking access, occupation and timing into account.
04Buildings and standards
Projects

Aincourt (95) · Listed building

Asnières-sur-Seine (92) · Strengthening · medical equipment

Saint-Cloud (92) · Post-damage survey
Further reading
05FAQ
Yes. Before adding one or more storeys, the capacity of the existing structure and foundations must be checked. The survey relies on available drawings, a site visit and, if needed, opening-up works; it guides the construction method of the extension and any strengthening.
Existing drawings if available, the planned works (new loads, openings, plant) and any information on observed defects. Without drawings, we define the surveys and investigations required.
Yes: analysis of defects, recalculation of affected members, strengthening solutions and survey reports, as for the 88-home building in Saint-Cloud.
Steel sections, reinforced concrete jacketing, bonded composites or member replacement: the solution depends on the loads, access, timing and cost.
Send us your drawings and constraints: we will propose a suitable approach and scope.