Structural surveys: how an existing building is assessed

Cracks, damage, an added storey or a change of use: the steps of a structural assessment, the possible investigations and how to read cracks.

Structural surveysNovember 7, 20266 min readCOFEC INTERNATIONAL
Structural surveys: how an existing building is assessed

Before adding a storey, converting offices into homes or after cracks appear, one question always comes up: can the existing structure carry what we are asking of it? Answering it is the purpose of a structural assessment.

Step 1: gathering documents

Original drawings, calculation notes, soil reports, history of works: every document found reduces uncertainty, and therefore the cost of investigations. Without them, the assessment relies more on surveys and opening-up works.

Step 2: site visit and surveys

The engineer identifies the load-bearing system, locates the defects and maps them. For cracks, location, orientation, width (crack gauge) and evolution over time are recorded, the latter with tell-tales fixed across the crack.

Step 3: investigations

Depending on what is at stake, these may include:

  • rebar detection and cover measurement (covermeter, radar);
  • cores to measure concrete strength;
  • carbonation depth and chloride content tests;
  • foundation trial pits, together with a geotechnical engineer.

Reading a crack

  • Fine, widespread cracks: often shrinkage, usually without structural significance.
  • Stepped or diagonal cracks near corners: a possible sign of differential settlement.
  • Cracks along the bars with spalling: reinforcement corrosion, to be treated quickly.
  • Mid-span cracks under a beam or slab: bending, to be compared with the re-analysis.

Only a combined analysis (geometry, evolution, re-analysis) allows a conclusion.

Step 4: re-analysis and recommendations

The analysis model includes the measured properties. The report ranks defects by severity and proposes solutions: monitoring, repair, strengthening (carbon fibre, jacketing, steel sections) or, sometimes, demolition.

Two recent examples

In Saint-Cloud, COFEC was appointed after damage in the first basement car park of an 88-unit building: diagnosis, re-analysis and reports. In Saint-Maur-des-Fossés, the survey of an added storey with a pool revealed undersized beams, missing connections and inadequate foundations; the comparative study led to demolition and rebuild, safer and more cost-effective than strengthening.