BIM: ISO 19650, IFC, BCF and IDS, what a client should require

BIM is more than a 3D model. ISO 19650, open IFC, BCF and IDS formats, level of information need: the keys to scoping a BIM assignment that really adds value.

BIMNovember 7, 20267 min readCOFEC INTERNATIONAL
BIM: ISO 19650, IFC, BCF and IDS, what a client should require

"Doing BIM" means nothing until you specify which information, for which uses, in which formats and when. That is precisely what international standards and open formats published in recent years address.

ISO 19650: organising information

The ISO 19650 series describes information management over the whole life cycle of an asset. Part 1 sets out the concepts, Part 2 covers the delivery phase, Part 3 the operational phase, Part 4 information exchange, Part 5 security and Part 6 health and safety information. Its main principles:

  • the client states its information requirements;
  • the delivery team responds with a BIM Execution Plan;
  • information flows through a common data environment (CDE) with clear states: work in progress, shared, published, archived.

Level of information need rather than "LOD"

Instead of generic levels of detail, ISO 7817-1 (2024) proposes defining the level of information need: for each object and each use, the geometry, data and documentation actually required. This avoids models that are too heavy or, conversely, unusable.

buildingSMART open formats

  • IFC (Industry Foundation Classes), standardised as ISO 16739-1. IFC 4.3, approved by ISO in early 2024, extends the format to infrastructure (roads, bridges, rail). For buildings, IFC 2x3 and IFC 4, widely certified in software, remain the safest choice.
  • BCF (BIM Collaboration Format) to exchange comments and clashes between models without resending files.
  • IDS (Information Delivery Specification) to describe, in a machine-checkable way, the information expected in an IFC file.

BIM uses that add value in structural engineering

  • Coordination and clash detection with architecture and services.
  • Formwork and reinforcement drawings extracted from an always up-to-date model.
  • Reliable concrete and steel quantities for tender packages.
  • Link between the analysis model and the digital model.
  • As-built model for operation.

Our advice to clients

  • Write a short information requirements document focused on expected uses.
  • Require IFC deliverables in a certified version, with native files if needed.
  • Plan model reviews and BCF issue management in the programme.

Is this relevant to your project?

Let’s talk: we help you apply these rules to your project.

Scroll to Top